Report 18 · Marlborough Rd
In progress

Fri, week 18 of 31
Agreed
Changes
Spent
This week
First fix electrics and plumbing in the rear room. Plasterers start Tuesday.
We need from you
Floor tile choice by Friday 6 June, so we can order in time.
How we work
You always know which stage you are in, what it costs so far and what we need from you next. This is the whole process, start to finish.
01
Stage 1 · Free · One hour
Jess comes to the house. She measures, looks at the structure, the drains and the access, and talks budget with you honestly. Before she leaves you have a cost range, and a view on whether the job is worth doing at all.
You get
A cost range, before she leaves
What needs drawings, planning or a party wall notice
An honest view on budget against what you want
02
Stage 2 · About 3 weeks
We survey, bring in the engineer and price the drawings line by line. If we are designing it, Tom draws it first. You get one figure, the schedule behind it and a programme by week.
You get
An itemised schedule and written exclusions
A week-by-week programme
Stage payments tied to work done, never ahead of it
03
Stage 3 · Every Friday
Samuel is on site every day and writes your report every Friday: photos, progress against the programme, money spent and anything we need you to decide. Changes are priced on a change note before they are built.
You get
A Friday report from week one to handover
A named project lead and a phone that answers
Change notes signed before anything is built
04
Stage 4 · Handover, then month 12
We walk the job with you and fix the snags. You get the certificates, the warranties and the paint colours in one file. A year later we come back and fix whatever has moved.
You get
Snag walk and building control sign-off
One file with every certificate and report
A return visit at month twelve
The Friday report
Short enough to read on your phone on the way home, and the same shape every week so you can compare.
01
Photos from the same spots every week
02
Progress against the programme
03
Agreed, changes and spent to date
04
Who is on site next week
05
Decisions we need from you, with a date
Report 18 · Marlborough Rd
In progress

Fri, week 18 of 31
Agreed
Changes
Spent
This week
First fix electrics and plumbing in the rear room. Plasterers start Tuesday.
We need from you
Floor tile choice by Friday 6 June, so we can order in time.
Payments
A typical extension, as a share of the fixed price. Your schedule is in the fixed price document before you sign.
Nothing. We do not take a deposit.
After building control signs them off
Watertight, with windows in
Plastered, wired and plumbed
After the snag walk
After the return visit
An hour at your house with Jess and a cost range before she leaves. Free.