How we work

Four stages, and a report every Friday in between.

You always know which stage you are in, what it costs so far and what we need from you next. This is the whole process, start to finish.

01

Stage 1 · Free · One hour

Site visit

Jess comes to the house. She measures, looks at the structure, the drains and the access, and talks budget with you honestly. Before she leaves you have a cost range, and a view on whether the job is worth doing at all.

You get

A cost range, before she leaves

What needs drawings, planning or a party wall notice

An honest view on budget against what you want

02

Stage 2 · About 3 weeks

Fixed price

We survey, bring in the engineer and price the drawings line by line. If we are designing it, Tom draws it first. You get one figure, the schedule behind it and a programme by week.

You get

An itemised schedule and written exclusions

A week-by-week programme

Stage payments tied to work done, never ahead of it

03

Stage 3 · Every Friday

Build and report

Samuel is on site every day and writes your report every Friday: photos, progress against the programme, money spent and anything we need you to decide. Changes are priced on a change note before they are built.

You get

A Friday report from week one to handover

A named project lead and a phone that answers

Change notes signed before anything is built

04

Stage 4 · Handover, then month 12

Handover and return

We walk the job with you and fix the snags. You get the certificates, the warranties and the paint colours in one file. A year later we come back and fix whatever has moved.

You get

Snag walk and building control sign-off

One file with every certificate and report

A return visit at month twelve

The Friday report

Five parts, the same every week.

Short enough to read on your phone on the way home, and the same shape every week so you can compare.

01

Photos from the same spots every week

02

Progress against the programme

03

Agreed, changes and spent to date

04

Who is on site next week

05

Decisions we need from you, with a date

Report 18 · Marlborough Rd

In progress

The new ground floor room mid-build, with exposed joists and bifold doors to the garden

Fri, week 18 of 31

Agreed

£151,200

£151,200

£151,200

Changes

£3,600

£3,600

£3,600

Spent

£110,050

£110,050

£110,050

This week

First fix electrics and plumbing in the rear room. Plasterers start Tuesday.

We need from you

Floor tile choice by Friday 6 June, so we can order in time.

Payments

You pay after each stage, never ahead of it.

A typical extension, as a share of the fixed price. Your schedule is in the fixed price document before you sign.

On signing

Nothing. We do not take a deposit.

0%

0%

Foundations and drainage done

After building control signs them off

15%

15%

Structure and roof done

Watertight, with windows in

35%

35%

First and second fix done

Plastered, wired and plumbed

30%

30%

Handover

After the snag walk

15%

15%

Month twelve

After the return visit

5%

5%

Book a site visit.

An hour at your house with Jess and a cost range before she leaves. Free.