Design and build · St Albans

A site report every Friday, against a price agreed before we start.

Extensions, whole-home renovations and kitchens. One project lead runs your job, and every Friday you see the photos, the progress and the money.

Report 31 · Marlborough Rd

Handed over

Rear of a 1930s semi with two new white rendered extensions and a paved terrace in evening light

Fri, week 31 of 31

Agreed

£151,200

£151,200

£151,200

Changes

£3,600

£3,600

£3,600

Spent

£154,800

£154,800

£154,800

This week

Snag walk with the family, building control sign-off, keys returned.

The one change

Bifolds widened to four panels, priced and signed in week 9 before we ordered them.

02 · Project, Marlborough Road

Two extensions on a 1930s semi, 31 Friday reports.

  1. Site cleared, carport downWeek 1Done
  2. Blockwork to first floorWeek 6Done
  3. Roof on, openings boardedWeek 10Done
  4. Windows in, scaffold struckWeek 14Done
  5. Render on, terrace nextWeek 24Done
  6. HandoverWeek 31Done
Marlborough Rd · rearWeek 31 of 31
Week 14 at Marlborough Road: grey blockwork shell with windows fitted, bricks and tarpaulins in the gardenWeek 31 at Marlborough Road: the same house finished, extensions rendered white with French doors onto a paved terrace
Spent of £151,200
£154,800
Budget band
£140k to £170k

02 · Project, Marlborough Road

Two extensions on a 1930s semi, 31 Friday reports.

  1. Site cleared, carport downWeek 1Done
  2. Blockwork to first floorWeek 6Done
  3. Roof on, openings boardedWeek 10Done
  4. Windows in, scaffold struckWeek 14Done
  5. Render on, terrace nextWeek 24Done
  6. HandoverWeek 31Done
Marlborough Rd · rearWeek 31 of 31
Week 14 at Marlborough Road: grey blockwork shell with windows fitted, bricks and tarpaulins in the gardenWeek 31 at Marlborough Road: the same house finished, extensions rendered white with French doors onto a paved terrace
Spent of £151,200
£154,800
Budget band
£140k to £170k

02 · Project, Marlborough Road

Two extensions on a 1930s semi, 31 Friday reports.

  1. Site cleared, carport downWeek 1Done
  2. Blockwork to first floorWeek 6Done
  3. Roof on, openings boardedWeek 10Done
  4. Windows in, scaffold struckWeek 14Done
  5. Render on, terrace nextWeek 24Done
  6. HandoverWeek 31Done
Marlborough Rd · rearWeek 31 of 31
Week 14 at Marlborough Road: grey blockwork shell with windows fitted, bricks and tarpaulins in the gardenWeek 31 at Marlborough Road: the same house finished, extensions rendered white with French doors onto a paved terrace
Spent of £151,200
£154,800
Budget band
£140k to £170k

Drawings by Kerr Dalton Architects. The family stayed in the house throughout. 41 m² added, final account £154,800 against £151,200 agreed.

Open the full project

04 · How we work

Four stages, and you can see which one you are in.

Stage 1 · Free

Site visit

An hour at your house with Jess. She measures, looks at the structure and gives you a cost range before she leaves.

Stage 2 · 3 weeks

Fixed price

Itemised and agreed in writing before anything starts. Changes are priced before they are built.

Stage 3 · Every Friday

Build and report

One named project lead. Photos, progress and money spent, in your inbox each week.

Stage 4 · Month 12

Handover and return

Snag walk, certificates, and a visit a year on to fix what has moved.

05 · Team

Who is on your job.

Jess Hollis in a black top and tan overalls, standing by a blue wall

Director · Project lead

Jess Hollis

Takes your calls

Tom Rowe in a blue jacket reading a drawing outside a new white building, a small digger behind

Director · Design

Tom Rowe

Draws your scheme

Samuel Okafor in blue overalls and a cap, arms crossed, on a building site

Site manager

Samuel Okafor

On site daily

Graham Dyer in a checked shirt in the workshop, tools hung on the wall behind

Head of joinery

Graham Dyer

In the workshop

06 · Questions

What people ask at the site visit.

Money, mess and permissions. If yours is not here, ask Jess when she comes round.

08 · Book a site visit

Book a site visit.

An hour at your house with Jess. She measures, looks at the structure and gives you a cost range before she leaves. Free, and you owe us nothing.

We reply within one working day. Or call 01632 960 418.

Create a free website with Framer, the website builder loved by startups, designers and agencies.