Kitchen

·

Harpenden

Ashfield Road

A kitchen built around the bookshelves

Final account

Handed over

Agreed

£58,900

£58,900

£58,900

Changes

£1,450

£1,450

£1,450

Final

£60,350

£60,350

£60,350

The change

The oak worktop run carried on to the window, priced in week 4.

Kitchen with a white panelled island, oak worktops and pendant lights under a vaulted ceiling

Weeks on site

12

12

Area added

46 m²

46 m²

Drawings

Designed in house

Designed in house

Budget band

£50k to £65k

£50k to £65k

The Friday reports

Week by week to handover.

  1. Units fitted by our joinersWeek 8Done
  2. Range and extraction inWeek 9Done
  3. Oak worktops onWeek 10Done
  4. Shelving and table madeWeek 11Done
  5. HandoverWeek 12Done
Ashfield Rd · kitchenWeek 12 of 12
Spent of £58,900
£60,350
Budget band
£50k to £65k

The Friday reports

Week by week to handover.

  1. Units fitted by our joinersWeek 8Done
  2. Range and extraction inWeek 9Done
  3. Oak worktops onWeek 10Done
  4. Shelving and table madeWeek 11Done
  5. HandoverWeek 12Done
Ashfield Rd · kitchenWeek 12 of 12
Spent of £58,900
£60,350
Budget band
£50k to £65k

The Friday reports

Week by week to handover.

  1. Units fitted by our joinersWeek 8Done
  2. Range and extraction inWeek 9Done
  3. Oak worktops onWeek 10Done
  4. Shelving and table madeWeek 11Done
  5. HandoverWeek 12Done
Ashfield Rd · kitchenWeek 12 of 12
Spent of £58,900
£60,350
Budget band
£50k to £65k

The job

A wall taken out between kitchen and dining room, a vaulted ceiling opened up, and a shaker kitchen made in our workshop to sit with forty years of books.

A wall taken out between kitchen and dining room, a vaulted ceiling opened up, and a shaker kitchen made in our workshop to sit with forty years of books.

Photos

Annie Spratt

The brief

Two small rooms, one long table and a lot of books. The owners wanted to cook and eat in the same room without giving up a single shelf.

What we built

We took down the wall between kitchen and dining room on a new steel, lifted the old floor for underfloor heating, and opened the ceiling up to the rafters. Graham’s team made the units in our workshop: painted shaker doors, solid oak worktops, and an island deep enough to hide the dishwasher.

  • Steel and building control sign-off

  • Underfloor heating on a new screed

  • Units, worktops and shelving made in our workshop

How the money went

Agreed at £58,900. The worktop run grew by a metre and a half to reach the window, which added £1,450. Final account £60,350, twelve weeks from first strip-out to handover.