Final account
Handed over
Agreed
Changes
Final
The change
The oak floor carried through the link into the barn, priced in week 20.

Weeks on site
Area added
Drawings
Budget band
The job
Photos
Toa Heftiba
The brief
A listed-feeling house with small rooms, and a barn at the end of the path that nobody used. The owners wanted one kitchen big enough for everyone, without knocking the house about.
What we built
Tom drew a narrow glass link that touches the house in one doorway and the barn in another. We repaired the barn frame, reclad it in black timber, and built the link on a slim steel frame with a flat roof. Planning took eleven weeks; the build took thirty-six.
Design, planning and building control in house
Barn frame repairs and new cladding
Structural glazing and a flat roof to the link
How the money went
Agreed at £186,000 with the drawings. Carrying the oak floor through the link added £4,900. Final account £190,900.
Book a site visit.
An hour at your house with Jess and a cost range before she leaves. Free.